Roundhouse roof supports
The blank left exterior wall will not be seen once the structure is in place on the layout. The interior side of the same wall will be inclosed as part of the shop/boiler room and also not be seen on the completed model, this makes a good surface plate for a jig to assemble the floor to roof supports.
The styrene blocks glued to the interior wall below will locate the prototypical 10"x10" vertical support posts while gluing the roof joists in place completing the assembly.
It is worth mentioning that the set of plans acquired from UCONN have a separate roof support plan that would allow a model to be built exactly complex as the prototype. This would not be seen on the completed model, so the much simplified support below will be adequate.
These pins will exactly locate the roof supports to the floor when inserted into the base plates glued on the floor in part 9 as below. The posts are now free standing but removable for painting before final assembly.
It's always nice to discover a new update on the progress you're making, Joe. I look forward to and enjoy them immensely. See you soon at NERPM!
ReplyDelete-Jim